Tunnel construction step-up transformer (100KVA-2000KVA) This product can solve the problem that the voltage of the grid is 300v, or even the lowest, the voltage is too low due to the long line, and all the equipment cannot be started normally due to too many equipment. Rise to 380-450v, use electrical equipment to start and work normally.